# Fabrication progress reports for general contractors | Fabgini

Canonical: https://fabgini.com/product/progress-reports/

The project report starts with recorded work. Every stage count has an entry behind it.

# Show the progress. Keep its source.

The project report starts with recorded work. Every stage count has an entry behind it.

[See a demo](https://fabgini.com/demo/)[See how it works](https://fabgini.com/product/progress-reports/#visual-example)

Read progress by batch. 

## Open the report. Follow the figure.

The approved sample shows stage quantities, holds and evidence. Fictional project data; incomplete installation stays incomplete.

### Read the KPIs beside the quantities.

KPIs for fictional batch B-204 only. The sample report’s project-wide installation total remains incomplete.

Fabricated share | 83.3 % 100 fabricated / 120 required units

| 

Installation progress | 52.6 % 40 installed / 76 dispatched units

| 

Installed share | 33.3 % 40 installed / 120 required units

| 

[](https://fabgini.com/illustrations/weekly-report.pdf) Progress by batch 

[](https://fabgini.com/illustrations/weekly-report.pdf) Holds and supporting entries 

[Open the sample report (PDF)](https://fabgini.com/illustrations/weekly-report.pdf)

## Project

Read progress by batch.

## Evidence

Keep the hold and its reason in view.

## Share

Use the weekly report in the project conversation.

How this works in detail 

## The five stages, per batch.

The report shows how many units are designed, fabricated, dispatched, delivered and installed, in units and square feet, and what changed during the week.

## Every status has its reason.

A held batch, a delivery gap or a design change shows with its reason, so the general contractor sees why a date moved and what happens next.

## Traceable to the entry.

Every figure traces back to the entry and the login that recorded it. Corrections keep the earlier entry, so the history behind a number is always there.

## Your name on the report.

Reports carry your company name and logo beside Fabgini’s. Print the report or save it as PDF; report email and read-only sharing are added through a quote.

What is in the Fabgini weekly progress report? For one project, the units designed, fabricated, dispatched, delivered and installed, in units and square feet, what changed during the week and the reason behind each status. It is made for the fabricator to send to its general contractor.

Is automatic report email included? The Starter Club includes printing and saving as PDF. Report email and read-only sharing are added through a quote.

## See it with your kind of work.

[See a demo](https://fabgini.com/demo/) [Factory to site](https://fabgini.com/product/factory-to-site/)[Pricing](https://fabgini.com/pricing/)[See a demo](https://fabgini.com/demo/)
