Dispatched
Factory76 / 120
Left the floor, with a batch reference.
24 fabricated units are available to dispatch.

Production and progress tracking for window, storefront and curtain-wall fabricators. One clear picture, from your floor to the installed wall.
Open a batch. Release a hold. Record a handoff.
See the project and its report change together.Example data. Reset at any time.
Tower A / B-204 · interactive example project
The elevation is your record made visible. Select a pane to see where it stands.
Every pane is one unit record. Select one to see where it stands.
Assembly 1 / Day shift / 3 people
Release the drawing hold in The batch to make the next units available.
Production quantities and stopped time are recorded separately.
Tower A / B-204
Record a handoff and follow the same units to the next stage.
76 / 120
Left the floor, with a batch reference.
24 fabricated units are available to dispatch.
76 / 120
The handoff has a receiving record.
Dispatch units first, then receive them here.
40 / 120
Installation stays distinct from delivery.
36 delivered units are available to install.
Every handoff updates the same record.
| Batch | Designed | Fabricated |
|---|---|---|
| B-204 | 100 / 120 | 100 / 120 |
| B-205 | 120 / 120 | 88 / 120 |
| B-206 | 120 / 120 | 44 / 120 |
| Tower A | 340 / 360 | 232 / 360 |
Drawing hold · B-204 · 20 units.
Record fabrication in On the floor, then return here. The B-204 row and project total change together.
No changes yet.
Explore four views of one record.
A batch on the floor. A delivery at site. A question from the general contractor. They belong to the same project. Now the answers do, too.
Try recording a handoffKnow what is released for making.
Follow the work through your floor.
Keep a record of what left.
Connect the handoff at site.
See what is in position.

“Waiting for gaskets” tells you something a red number never will. Keep the time, the reason and the affected work together.
Follow the floor entries1 h 12 min
08:10 · Work started.
10:20 · Workstation stopped, waiting for gaskets.
11:32 · Materials arrived, work resumed.
A recorded reason. A traceable interval.

Frames take shape on the bench. Units leave on a rack. Glass takes its place on the wall.
Fabgini connects those handoffs to the same project, so factory completion and installation stay in view.
Follow a unit to siteOpen the project. See the quantities. Follow a hold back to the affected batch. Give the weekly conversation something concrete to work with.
Open the example reportThree batches. One project.
Sample report · explore the interactive project above.
Correct the record without erasing the original entry. Keep the reason for the change alongside the work.
When the evidence is incomplete, the gap stays visible. An unavailable figure is not silently turned into a result.
Fabgini works beside estimating and accounting. It tracks production and progress, from designed to installed.
One plant. 15 logins. 20 work centres.
Clear inclusions, with room to add capacity.
CAD 899/ month
CAD 8,990 / year, paid up front.
US companies pay the same figures in US dollars. Before tax.
Larger operation? Talk through a custom quote.

May we use analytics cookies to understand which pages are useful? You can say no and still use the whole site. Change your choice anytime through Privacy choices in the footer. Read our privacy notice.